Engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Can you put engineered hardwood on concrete.
Sometimes concrete can be uneven and possibly contain high levels of moisture.
If you are considering installing hardwood floor on concrete in a new construction scenario you must ensure that the concrete has had adequate drying time.
You need to remedy both problems before you can glue engineered hardwood on top of it.
Glue down engineered hardwoods can be glued note.
You usually determine this with a meter that compares the relative humidity of the slab with the ambient humidity.
Fortunately even if your home was built on a concrete slab you can.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
Does this mean you can t get hardwood.
Gluing works well when you are installing engineered hardwood over a concrete subfloor but be sure you clearly understand the manufacturer s application instructions before you glue that floor.
For any flooring installation over concrete you should anticipate potential problems with moisture levels.
Follow these steps to install an engineered wood floor in your home.
If you want to install a new floor but currently have a concrete slab for flooring you might be wondering whether it s possible to install a hardwood floor.
Like any wood product.
Before you prepare the concrete for hardwood flooring it must be dry.
1 nail down requires plywood sub flloor you can t nail into concrete last i checked 2.
Solid hardwood can not be glued except for bamboo 3.
Engineered hardwood is sturdier than traditional plank but surface preparation still matters.
Hardwood installation on concrete is not as easy as you would think.
If you re curious how to install hardwood floor on concrete slab there are a few things you should know.
Float this is when the hardwood is clicked into each other or glued at joints but is not attached to the floor.
If the slab is new don t even begin moisture testing until 30 days after pouring it it probably won t be ready to be covered until 60 days after.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.